Important: Cloud will proceed maintenance on December 22 at 9pm(UTC +8) and it will take approximately 3 hours to complete
Affected features:
- Regular database maintenance
Important: Cloud will proceed maintenance on December 22 at 9pm(UTC +8) and it will take approximately 3 hours to complete
Affected features:
Important: Cloud will proceed upgrade on November 15 at 9PM (UTC +8) and it will take approximately 3 hours to complete
Enhancement:
Important: Cloud will proceed upgrade on October 18 at 9PM (UTC +8) and it will take approximately 3 hours to complete
Enhancement:
Please refer below link for information on list which add-on package is supported on which firmware version:
https://support.edge-core.com/hc/en-us/articles/24216698455193
Edgecore Wi-Fi announces the end-of-sale and end-of-life dates for the Edgecore EAP100 Wi-Fi 5 Indoor Access Point. The last day to order the affected product(s) is October 1, 2023.
This product is being discontinued due to market demand and shifts in technology. To facilitate the transition in the End-of-Life process, below are some key dates to acknowledge:
| Milestone | Definition | Date |
| End-of-Life (EOL) Announcement | The date the document announces the end of sale and end of life of a product is distributed to the general public. | Oct 1, 2023 |
| End of Sale (EOS) | The last date to order the product. The product is no longer for sale after this date. | Dec 31, 2023 |
| End of Software Maintenance (EOSM) | The last date that the Edgecore Engineering Team may release any final software maintenance releases or bug fixes. After this date, the Edgecore Team will no longer develop, maintain, or test the product software. | Oct 1, 2024 |
| End of Hardware Maintenance (EOHM) | The last possible date a failure analysis may be performed to determine hardware failure or defect. | Oct 1, 2026 |
* The final date will depend on the continued availability of stock and, at Edgecore’s discretion, the actual end-of-sale date may be earlier.
For more information, please visit: https://edge-core.com/eol-product-list/
Edgecore finds that ELECOM cables have difficulties being unplugged from SP-W2M-AC1200.
Main reason is because of the material and design of ELECOM cables, which results in insufficient space for movements causing it not to be unplugged with ease from the latch.
v12.4.5 for EAP101 and EAP102 has been released, v12.4.0/v12.4.1/v12.4.3 will be removed from cloud
v3.2.1-4787 for SP W2 AC1200 has been released, v3.1.1-4763 will be removed from cloud
Important: Cloud will proceed upgrade on September 13 at 9PM (UTC +8) and it will take approximately 3 hours to complete
Enhancement:
1. Fixed SP-W2-AC1200 cannot perform upgrade from v3.1.1-4763
2. Enhanced User experience for Site Grouping
– Adjust Color for Group menu
– Adjust site display in site grouping page
– Support multiple Sites selection
3. Unified Wireless Statistics page for Wifi5 & Wifi6
– Display correctly when device radio is not initialized
4. Fixed missing HTTPs domain after reload page.
5 Adjusted table alignment in different screen resolutions.
6. Fixed VLAN tag traffic internal error when enabling Quectel LTE dongle
7. Supported mgmt log level for EAP101/EAP102/EAP104 12.4.5
8. Removed unused HTTPs configuration for Hotspot external captive portal
9. Fixed incorrect txpower display in Activities
10. Fixed permission issue for hotspot page in guest permission.
11. Fixed issue to accept blank space in venue name for OpenRoaming configuration.
12. Removed “TRACK” and “NOTRACK” firewall rule.
Important: Cloud will proceed upgrade on August 16 at 9PM (UTC +8) and it will take approximately 3 hours to complete
Enhancement:
Important: Cloud will proceed upgrade on July 14 at 9PM (UTC +8) and it will take approximately 3 hours to complete
Enhancement:
Important: Cloud will proceed upgrade on June 19 at 11PM (UTC +8) and it will take approximately 3 hours to complete
Enhancement:
In v12.4.0 for EAP101 and EAP102, we have implemented Framed-IP-Address into RADIUS accounting. In this feature, the IP address of the supplicant or client will be included into the Accounting Start Request packet. The concept is to wait for the DHCP 4-way handshaking process to complete and the IP address of the supplicant can then be obtained. By default, this feature is enabled and can be disabled by following the technical guide from here.

Important: Cloud will proceed upgrade on May 12 at 11PM (UTC +8) and it will take approximately 3 hours to complete
Enhancement: